Public Jobs

Bids due in 24 days
5/14/19 2:00 pm
Urbandale High School - HVAC Renovation
DLR Group
Urbandale, IA
Project consists of the upgrading the existing mechanical and electrical systems of a North Gymnasium, South Gymnasium and assoicated support/athletic areas, The work includes all General, Mechanical, and Electrical Work.
Bids due in 19 days
5/9/19 2:00 pm
Boone High School Auditorium Sound & Lighting Renovations
DLR Group
Boone, IA
Project consists of the renovation of the high school auditorium sound and lighting systems. In addition to the sound and lighting systems, selective/associated interior renovation will occur in the auditorium. the work includes all General, Mechanical, and Electrical Work.
Bids due in 24 days
5/14/19 3:00 pm
Urbandale High School & Webster Elementary School- Entry Modifications
DLR Group
Urbandale, IA
Project upgrading the existing main entry vestibules to provide direct entry into the main office spaces of both the Urbandale High School and Webster Elementary School. Additionally, a tiered computer lab will be re-configured to a single level clasroom space. The work includes all General, Mechanical, and Electrical Work
Bids due in 25 days
5/15/19 2:00 pm
Waukee Community Entrance & Placename Signage
Shive-Hattery, Inc.
Waukee, IA
The extent of the work on this project is the furnishing of all labor, equipment, and materials for the fabrication and installation of signage in Waukee generally described as follows: Fabrication and installation of branded community signage to denote City Hall, three parks and an entrance to the City. Scope of work includes but is not limited to sign fabrication and installation, excavation, concrete footing placement, electrical distribution, landscaping and site restoration.
Bids due in 12 days
5/2/19 2:00 pm
Diagonal Community School District: ADA Improvements
ETHOS Design Group
Diagonal, IA
This project includes all materials, equipment, transportation and labor and support needed to construct the Design Soultion, per Drawings and Specifications for the Renovations for the project listed above.
Bids due in 12 days
5/2/19 2:00 pm
West Des Moines CSD - Westridge Elementary 2019 Masonry Improvements
Shive-Hattery, Inc.
West Des Moines, IA
The general nature of the work is as follows: The repair/replacement of masonry, tuckpointing, sealant in noted areas, on Westridge Elementary.
Bids due in 10 days
4/30/19 2:00 pm
South Winneshiek Elementary School Roof Replacement
DLR Group
Ossian, IA
The Project consists of tearing off existing asphalt shingles and replacing with new standing seam metal roof over the elementary school building. The building is one-story in height, wood-framed roof construciton, with a total area of approximately 20,200 square feet. The work includes all General, Mechanical, and Electrical Work.
Bids due in 5 days
4/25/19 3:00 pm
South Hamilton CSD - New Concession Stand Facility
Angelo Architectural Associates
Jewell, IA
Refer to scope of work documents, drawings and specifications for specific information.
Bids due in 3 days
4/23/19 3:00 pm
IVCCD - Reg Johnson Masonry Cleaning and Repair
TSP, Inc.
Iowa Falls, IA
The Project generally consists of masonry cleaning, repair, and tuck-pointing of Reg Johnson Hall. The facade has 3 brick types that may need some replacements. All existing control joints shall be re-caulked, and all steel lintels shall be cleaned, prepped and repainted. Alternates will be taken for alternate completion date, cleaning, re-caulking and sealing precast concrete wall panels, and cast stone sills in lieu of rowlock brick sills.
Bids due in 3 days
4/23/19 2:00 pm
IVCCD - Reg Johnson HVAC Equipment Replacement
TSP, Inc.
Iowa Falls, IA
The Project consists of replacing all the existing furnaces and replacing the existing rooftop condensers with heat pumps. All new equipment shall be connected to the existing Venstar WiFi thermostat system.