Public Jobs

Bids due in 14 days
3/6/18
Crestwood HS - Parking Lot & Baseball/Softball Field Improvements
DLR Group
Cresco, IA
Project consists of the construction for improvements to the Crestwood High School property including the following: Removal of the existing asphalt parking lot south of high school and replace with new Portland Cement Concrete, demolition of existing bleacher structures at both baseball and softball fields and installation of new permanent steel grandstands and pressboxes.
Bids due in 14 days
3/6/18
North Polk School District - Furniture
ETHOS Design Group
Alleman, IA & Polk City, IA
This contract is including but not limited to the following: Provide all labor, materials, equipment, transportation and support needed to provide and install furniture for Renovations for North Polk Middle School & West Elementary School. Project items include but are not limited to: Provide all furniture per the Furniture Drawings & Furniture Schedules. The scope of work for this project shall be as set forth in the Furniture drawings and Schedules. The Contract shall include all parts and labor necessary to provide a complete solution ready for use by the Owner. See drawings for additional information.
Bids due in 14 days
3/6/18
North Polk School District - Signage
ETHOS Design Group
Alleman, IA & Polk City, IA
This contract is including but not limited to the following: Provide all labor, materials, equipment, transportation and support needed to provide and install signage for Renovations to North Polk Middle School & West Elementary School. Project itmes include but are not limited to: Provide all Signage per the Signage Drawings & Signage Schedules. The Scope of the work for this project shall be as set forth in the Signage drawings and Schedules. The Contract shall include all parts and labor necessary to provide a complete solution ready for use by the Owner. See drawings for additional information.
Bids due in 21 days
3/13/18
WDMCS - Elementary School Vestibule Renovations
Shive-Hattery, Inc.
West Des Moines, IA
The general nature of the work is as follows: The West Des Moines Community School District is modifying the entry vestibules at all eight of its elementary school buildings to support a more desirable traffic pattern for visitors. The renovations will establish traffic patterns such that visitors can be forced through the office before gaining access to the main circulation areas of the school building. The amount of effort varies for each of the school buildings ranging from the removal of small portions of existing wall and window for the installation of a new door to the office at Fair Meadows and Hillside Elementary Schools to a full demolition and the construction of a new vestibule and office area at Crossroads Elementary. This work is time sensitive; it needs to be completed over the 2019 summer break and ready for the school to move into leading to the start of classes in August.
Bids due in 9 days
3/1/18
Dallas County Law Enforcement
Design Alliance
Adel, IA
The Construction of the Dallas County Law Enforcement Center shall include work included in Bid Category #5 - Metals. Work identified in Bid Category #5 includes work associated to supply and install structural steel and metal fabrications in compliance with the requirements of the Contract Documents. The scope of work to be included in this bid shall be Bid Category No. 5 - Metals. Only Bid Category #5 is being bid. All other Bid Categories have been previously awarded.
Bidding Closed
1/16/18
Louisa Muscatine CSD - 2018 Roof Improvements
Shive-Hattery, Inc.
Letts, IA
The general nature of the work is as follows: The Project consists of the replacement of Roof Areas A, B, C, F, G, H, and I on the Elementary School at approximately 62,948 square feet.
Bids due today at 2:00pm
2/20/18
2018 Saydel High School Boiler Replacement
Twin Rivers Engineering
Des Moines, IA
Removal of three existing steam boilers and related piping and equipment from the boiler room at Saydel High School. A new hot water heating plant with three new high efficient hot water boilers, boiler pumps and associated piping to serve the two existing heating hot water distribution systems.
Bids due in 9 days
3/1/18
Harding MS - Restroom Renovations
Angelo Architectural Associates
Des Moines, IA
This project is too clean up and provide a more modern clean appearance and function to the (6) restrooms in the existing original school building.
Bids due in 9 days
3/1/18
East HS - Restroom Renovations
Angelo Architectural Associates
Des Moines, IA
This project is too clean up and provide a more modern clean appearance and function to the (4) restrooms surrounding the existing competition gymnasium.
Bidding Closed
2/13/18
GRC Visitors Center Roof Replacement
Iowa Department of Administrative Services
Glenwood, IA
This job includes, but is not limited to, replacement of approximately 4,900 sq. ft. of asphalt shingles, gutters/downspouts, sheeting, misc. epdm, metal coping cap, roof anchors, and misc. roofing details at the Glenwood Resource Center