2018 Saydel High School Boiler Replacement

Removal of three existing steam boilers and related piping and equipment from the boiler room at Saydel High School. A new hot water heating plant with three new high efficient hot water boilers, boiler pumps and associated piping to serve the two existing heating hot water distribution systems.

Status

Accepting Bids

Prebid Date2/6/18 4:00 pm

Bid Date2/20/18 2:00 pm

Company & Contacts

Twin Rivers Engineering

Dave Losen  

Location

Des Moines, IA

Please read ALL information below before placing your order
Deposit: $50.00 refundable deposit or MBI/ABC card, payable to Saydel CSD (send to Action Reprographics).
Shipping: $18.00 shipping & handling fee applies to each set shipped UPS, payable to Action Reprographics. Shipping charges will be accepted by check or by credit card. To pay by credit card, include your credit card information in the Comments box while placing your order (please include cc#, expiration date, 3-digit code, and zip code). Credit cards will NOT be accepted for the Deposit.
If you opt to ship using your own UPS account, a $7.00 bag/handling fee will still apply, payable to Action Reprographics.
****Sets will not be shipped until proof of Deposit and Shipping payments have been received. To expedite orders to be shipped, email to: planroom@actionrepro.com a copy of your deposit and shipping checks prior to mailing. In addition to sending your checks, you must also place your order through the website.
Delivery: Local delivery (Des Moines area) is available for $7.50
Send all Deposit and Shipping Checks to – Action Reprographics, 5037 NE 14th St, Des Moines, Iowa 50313.
To place an order: Click on the green arrow Order above for hard copies of specs and plans and the Download box for electronic files.
Please email planroom@actionrepro.com or call Action Reprographics, 515-288-2146, with any questions. Thank you.